×

Case Studies

Date: 13/01/2025

Hillingdon Railway Stabilisation – RamWall

RamWall – Hillingdon Railway Stabilisation Project: Hillingdon Railway Stabilisation Owner: Metronet Rail Designer: Pell Frischmann. Contractor: J Murphy & Sons LTD. Purpose: Upper cutting slope stabilisation below adjacent property. RamWall…

View Post
Date: 13/01/2025

Barking Depot Loading Platform – RamWall

RamWall – Barking Depot Loading Platform Project: Barking Steel Fabrication Depot Loading Platform Owner: Kierbeck LTD. Designer: Innovative Support Systems LTD & Kierbeck LTD. Contractor: Kierbeck LTD (Natural Cement supervision)….

View Post
Date: 10/01/2025

Drumlanrig Railway Tunnel Stabilisation – RamArch

RamArch – Drumlanrig Railway Tunnel Stabilisation Project: Drumlanrig Railway Tunnel Stabilisation Owner: Network Rail Designer: MHB Consultants Contractor: AMCO Purpose: Stabilisation of a brick-lined railway tunnel lining. RamArch Type: Plain…

View Post
Date: 10/01/2025

Clay Cross Railway Tunnel Stabilisation – RamArch

RamArch – Clay Cross Railway Tunnel Stabilisation Project: Clay Cross Railway Tunnel Stabilisation Owner: Network Rail Designer: Donaldson Associates & Innovative Support Systems Contractor: AMCO Purpose: Stabilisation of a brick-lined…

View Post
Date: 09/01/2025

Netherton Canal Tunnel Refurbishment – RamArch

RamArch – Netherton Canal Tunnel Refurbishment Project: Netherton Canal Tunnel Refurbishment Owner: Canal & River Trust Designer: Jacobs Associates & OTB Engineering Contractor: May Gurney Purpose: Strengthening of a brick-lined…

View Post
Date: 09/01/2025

Knoll Beck Culvert Repairs – RamArch

RamArch – Knoll Beck Culvert Repairs Project: Knoll Beck Culvert Repairs Owner: Barnsley Metropolitan Borough Council Designer: Innovative Support Systems Contractor: Barnsley Council & Sprayed Concrete Services Ltd. Purpose: Strengthening…

View Post