×

Case Studies

Date: 20/01/2025

Woodseaves canal cutting stabilisation – RamWall

RamWall – TWoodseaves canal cutting stabilisation PROJECT: Woodseaves canal cutting stabilisationOWNER: Canal and Rivers TrustDESIGNER: OTB Engineering Ltd.CONTRACTOR: Kier May GurneyPURPOSE: Retaining walls supporting an unstable cutting slope adjacent to…

View Post
Date: 20/01/2025

Tonfanau coastal erosion cliff stabilisation – RamWall

RamWall – Tonfanau coastal erosion cliff stabilisation Project: Tonfanau coastal erosion cliff stabilisation Owner: Network Rail Designer: Tony Gee & Partners LLP / OTB Engineering Ltd Contractor: AMCO Rail Purpose:…

View Post
Date: 20/01/2025

Pitsea Station Improvements – RamWall

RamWall – Pitsea Station Improvements Project: Pitsea Station Improvements Owner: Network Rail Designer: Pell Frischmann / OTB Engineering Ltd. Contractor: J Murphy & Sons Ltd. Purpose: Retaining walls adjacent to…

View Post
Date: 20/01/2025

Crossaig Ravine 1 and Ravine 2 access – RamWall

RamWall – Crossaig Ravine 1 and Ravine 2 access Project: Crossaig Ravine 1 and Ravine 2 access Owner: Scottish & Southern Energy Designer: Tony Gee & Partners LLP / OTB…

View Post
Date: 20/01/2025

Chiswick Park to Acton Town embankment stabilisation – RamWall

RamWall – Chiswick Park to Acton Town embankment stabilisation Project: Chiswick Park to Acton Town embankment stabilisation Owner: Metronet Rail Designer: Metronet Alliance / OTB Engineering Ltd Contractor: Clancy Docwra…

View Post
Date: 16/01/2025

Tunnel Central (High Neck), Liverpool – Phase 2 – RamArch

RamArch – Tunnel Central (High Neck), Liverpool – Phase 2 PROJECT: Tunnel Central (High Neck), Liverpool – Phase 2OWNER: Network RailDESIGNER: Network RailCONTRACTOR: Network RailPURPOSE: Stabilisation of a brick-lined railway…

View Post